Mound systems and aerobic treatment units: cost and upkeep in Florida
November 20, 2026
A mound system costs $10,000 to $20,000 to install, and so does an aerobic treatment unit (ATU) system, according to Angi's 2026 figures. A conventional tank and drain field is $3,000 to $8,000. So if a contractor tells you a conventional system won't pass, the price roughly doubles.
Why a Florida lot needs one
A mound raises the drain field above ground in a bed of sand. It's the usual answer when the seasonal high water table is too close to the surface for a buried field, which is common in Florida. Broward County even charges a separate permit fee for "filled or mound systems" ($260, against $210 for a standard system).
An ATU pumps air into the tank so the bacteria break waste down further before it reaches the field. Angi notes it needs a continuous power source, so a long outage matters. In springs protection areas, nitrogen-reducing ATUs (certified to NSF-245) are one of the approved ways to meet the nitrogen rule.
What an ATU costs after it's in
This is the part quotes leave out. In Florida:
- Operating permits are required for ATUs and performance-based treatment systems (DOH-Hardee lists this among its permit types).
- Seminole County's upgrade program spells it out: nitrogen-reducing ATUs and performance-based systems need a maintenance contract and an operating permit from the county health department. In-ground nitrogen-reducing biofilters don't.
- EPA says alternative systems with pumps, float switches or other mechanical parts should be inspected about once a year.
Ask the installer what the maintenance contract costs per year and who you call when the alarm goes off. Get it in writing before you choose between an ATU and a biofilter.
A mound's upkeep
A mound still has a septic tank, so it still needs pumping. It also has a pump and an alarm, which are the parts that fail. Keep vehicles and heavy equipment off it, as with any drain field.
Paying for it
If your property is in a springs Priority Focus Area, a county program may pay up to $10,000 toward a nitrogen-reducing upgrade. See Florida septic upgrade grants.
Get prices from up to 3 registered contractors.
Sources: Angi septic system cost, Angi drain field cost, DOH-Hardee onsite sewage, Seminole County upgrade program, DOH-Broward repair packet, EPA septic care.